![]() On the West façade, the fake-brick material on the headhouse would be replaced with standing-seam metal, he added. Parking would be limited to the second floor, while at the ground level, a new storefront would be added, bringing the number of retail opportunities to five.ĭavid Tabenken, an architect with Hacin + Associates, said the proposed project has been modified based on feedback the development team received at a July 23 BHAC subcommittee meeting, with “key takeaways” including replacing existing granite veneer at all storefronts on the Charles Street façade providing broom-finished concrete at the passageway restoring the historic Boston Edison lamp at the passage on the north facade maintaining the existing sconces at Savenor’s Market on the north facade maintaining the existing gooseneck lighting above Savenor’s and removing the green-screen system on the west façade to allow for natural ivy growth, among other suggested changes to their original plan.Īs opposed to in the earlier proposal, only a few windows on the east façade of the building that have broken seals would be replaced, said Tabenken, while lighting on end of the garage would be removed at the subcommittee’s request.īlade signs for the retail spaces would measure 2-by-2 feet, said Tabenken., but their shapes could be unique to each individual storefront. New roofdeck amenities would be also created for the use of office tenants only. ![]() into office space accessible via a new lobby at the street level. 19 monthly hearing, which took place virtually.ĭeveloper, Related Beal, is partnering with the architectural firm, Hacin + Associates, on the project that would convert the top two floors of the building at 144 Charles St. The Beacon Hill Architectural Commission approved an application for the proposed transformation of the Charles Street Garage during its Aug.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |